A sample of projects relating to site design and engineering, including storm drain improvement, detention pond design, parking lot layout, roadway design, concrete paving, site grading, etc.
Veteran’s Memorial Park [2010]
Monroeville, Alabama
Engineering Site Design
Design and Construction of Regulation Babe Ruth Baseball Field
Construction Cost: $406,000
Veteran’s Memorial Park [2010]
Monroeville, Alabama
Engineering Design and Construction Observation
Installation of 4,500 SY of soil aggregate base, 1,300 LF of storm drainage pipe, 13 drainage structures, and 625 tons of 424A bituminous concrete surface
Construction Cost: $125,000
Jay Cemetery [2010]
Jay, Florida
Engineering Design
Cemetery Plot Layout and corrections
Bridge Boat Ramp [2009]
Camden, Alabama
Engineering Design and Construction Observation
Installation of 2 cast-in-place concrete boat ramps to replace the existing deteriorated concrete planks
Construction Cost: $23,000
Hinson Commercial Development [2009]
Brewton, Alabama
Engineering Site Design
Site Design including: storm drainage improvements, detention pond design, parking lot layout, site grading, and utility design.
Hainjes Furniture Store [2008]
Monroeville, Alabama
Engineering Site Design
Site Design including: storm drainage improvements, detention pond design, parking lot layout, site grading, and utility design.
Total Estimated Project Cost: $1,000,000
Buy-Rite Pharmacy [2008]
Atmore, Alabama
Engineering Site Design
Site Design including: storm drainage improvements, parking lot layout, site grading, and utility design.
City of Monroeville Fire Station No. 3 [2008]
Monroeville, Alabama
Engineering Site Design
Site Design including: lot layout, parking lot design, and site grading.
Site Improvements Construction Cost: $55,000
Medical Health Clinic [2007]
Monroe County, Alabama
Engineering Site Design and Construction Observation
Site Design including: electrical meter set, HVAC system, all required plumbing, site work/landscaping, bituminous concrete paving, two wooden decks, a wooden pavilion, and other related appurtenances.
Site Improvements Construction Cost: $117,161
International Sign & Design [2007]
Monroeville, Alabama
Engineering Site Design and Construction Observation
Site Design including: storm drainage improvements, parking lot layout, site grading, and loading docks.
Site Improvements Construction Cost: $64,675
Holiday Inn Express [2007]
Andalusia, Alabama
Engineering Site Design
Site Design including: storm drainage improvements, detention pond design, parking lot layout, site grading, and utility design.
Site Improvements Construction Cost: $200,000
Shadow Creek Subdivision [2007]
Camden, Alabama
Engineering Design
Design of 123 Lot Residential Subdivision on the Alabama River. Engineering Design included: lot layout, roadway improvements, storm drainage improvements, potable water distribution system, and sanitary sewer collection system.
Site Improvements Construction Cost: $1,250,000