Projects

Street & Drainage Improvements

A sample of projects relating to street and drainage system improvments.

Camden, Alabama [2011]
Street Resurfacing and Storm Drainage Improvements

Engineering Design and Construction Observation
Resurfacing of various streets, 130 LF of RCP, 6 drainage structures, and valve/manhole adjustments
Construction Cost:  $137,000

Evergreen, Alabama [2011]
Street Resurfacing
Engineering Design and Construction Observation
Resurfacing of various streets
Construction Cost:  $22,000

Jay, Florida [2010]
Roadway Improvements
Engineering Design and Construction Observation
Re-alignment of 2000 LF of roadway including all utilities
Funded by CDBG Grant ~ Construction Cost:  $293,000

Flomaton, Alabama [2010]
Bridge Approach Improvements
Engineering Design and Construction Observation
Installation of 1,200 SY of 6” soil aggregate base, 700 LF of concrete shoulder with integral footer, 300 tons riprap, 130 tons of bituminous concrete surface
Construction Cost:  $85,000

Flomaton, Alabama [2009]
Street Resurfacing

Engineering Design and Construction Observation
Resurfacing of various city streets.
Construction Cost:  $300,000

Andalusia, Alabama [2008]
Industrial Access Road Improvements

Engineering Design and Construction Observation
Design of 4,000 linear foot, 24' wide, two lane access road.
Funded by ALDOT.  Construction Cost:  $1,450,000

Atmore, Alabama [2007]
Street Resurfacing

Engineering Design and Construction Observation
Resurfacing of various city streets.
Construction Cost:  $558,000

Orange Beach, Alabama [2007]
Storm Drainage Improvements

Engineering Design and Construction Observation
Installation of 2 large precast concrete box culverts to replace existing undersized structures.
Construction Cost:  $232,500

Monroeville, Alabama [2007]
Culvert Replacement

Engineering Design and Construction Observation
Installation of 70 L.F. of Triple Barrel RCp Culvert, 2 Headwalls, and 60 tons of Riprap
Construction Cost:  $60,000

Excel, Alabama [2007]
Street Resurfacing

Engineering Design and Construction Observation
Resurfacing of various city streets.
Construction Cost:  $85,000